Page 1 of 2
Non-Food CE Add-on
1.1 Is certification and marking for key electrical components defined in Incoming Control Procedure and checked upon reception?
*
Incoming Inspection Procedure:
Click to choose a file or drag here
*
Key Electrical components list:
Click to choose a file or drag here
*
1.2 Is there a process in factory to ensure that relevant registrations and certifications are maintained? (Product compliance for US/EU/AU/KR)
*
Product Regulatory Registrations:
Click to choose a file or drag here
*
Records of Regulatory application and approval:
Click to choose a file or drag here
*
1.3 Does check and confirm polarization and circuit protection check before Input power?
*
Document on polarization / circuit protection:
Click to choose a file or drag here
*
Records of checking of polarization / circuit protection:
Click to choose a file or drag here
*
1.4 Is there a standard to conduct Input Power check and "Hi-Pot Test" to confirm that the product is in order, 100% of production?
*
Procedure on checking of Hi-Pot Test:
Click to choose a file or drag here
*
Records of checking of Hi-Pot Test:
Click to choose a file or drag here
*
1.5 Is there a standard running test to confirm that the product is working on based on product specification?
*
Procedure Running Test:
Click to choose a file or drag here
*
Running Test Records:
Click to choose a file or drag here
*
1.6 Does the facility check refrigerant quantity vs specification before final sealing (note for products that use refrigerant)
*
Procedure for Refrigerant quantity check:
Click to choose a file or drag here
*
Records of refrigerant quantity:
Click to choose a file or drag here
*
1.7 Does the supplier have a defined process to develop new items? Does the factory design and develop articles for different Markets?
*
Design and Development procedure:
Click to choose a file or drag here
*
Records of inhouse design and development:
Click to choose a file or drag here
*
Products that where designed and developed inhouse:
Click to choose a file or drag here
*
1.8 Does the factory have a ESD Procedure and control?
*
ESD Procedure:
Click to choose a file or drag here
*
ESD Checking records:
Click to choose a file or drag here
*
1.9 Is there a Life test conducted for the Final product and data of life test analyzed and kept
*
Procedure of Life Test (Reliability Test):
Click to choose a file or drag here
*
Records of Life Test (Reliability Test):
Click to choose a file or drag here
*
Life Testing Area:
Click to choose a file or drag here
*
1.10 Does the factory have a ESD Procedure and control?
*
Training records for Final Test and Final Visual Inspection:
Click to choose a file or drag here
*
Training documents/material used for specialized training:
Click to choose a file or drag here
*
Section 2: On Boarding Document
8.2.1 Certificate of Electrical Appliances
*
Certificate of Electrical Appliances:
Click to choose a file or drag here
*
8.2.2 Radio Certification
*
Radio Certification:
Click to choose a file or drag here
*
8.2.3 Radio Test Report
*
Radio Test Report:
Click to choose a file or drag here
*
8.2.4 Energy Efficiency Test Report
*
Energy Efficiency Test Report:
Click to choose a file or drag here
*
8.2.5 Energy Efficiency Registration Confirmation
*
Energy Efficiency Registration Confirmation:
Click to choose a file or drag here
*
8.2.6 Korean User Manual
*
Korean User Manual:
Click to choose a file or drag here
*
8.2.7 B-type Letter
*
B-type Letter:
Click to choose a file or drag here
*
8.2.8 Artwork (Korean Label)
*
Artwork (Korean Label):
Click to choose a file or drag here
*
8.2.9 Artwork (Korean Label)
*
Artwork (Korean Label):
Click to choose a file or drag here
*
8.2.10 Overseas Manufacturer Code
*
Overseas Manufacturer Code:
Click to choose a file or drag here
*
8.2.11 Factory Registration Certificate
*
Factory Registration Certificate:
Click to choose a file or drag here
*
8.2.11 Factory Registration Certificate
*
Factory Registration Certificate:
Click to choose a file or drag here
*
8.2.12 Factory Registration Certificate
*
Factory Registration Certificate:
Click to choose a file or drag here
*
8.2.13 Manufacturer Confirmation Letter
*
Manufacturer Confirmation Letter:
Click to choose a file or drag here
*
8.2.13 Pre-shipment Inspection Report
*
Pre-shipment Inspection Report:
Click to choose a file or drag here
*
8.2.14 test report
*
test report:
Click to choose a file or drag here
*
8.2.15 Technical Document(Circuit Diagram, Block Diagram, Product Specification Sheet and etc)
*
Technical Document(Circuit Diagram, Block Diagram, Product Specification Sheet and etc):
Click to choose a file or drag here
*
Submit