Page 1 of 2

Non-Food CE Add-on

1.1 Is certification and marking for key electrical components defined in Incoming Control Procedure and checked upon reception?

Incoming Inspection Procedure:
Key Electrical components list:

1.2 Is there a process in factory to ensure that relevant registrations and certifications are maintained? (Product compliance for US/EU/AU/KR)

Product Regulatory Registrations:
Records of Regulatory application and approval:

1.3 Does check and confirm polarization and circuit protection check before Input power?

Document on polarization / circuit protection:
Records of checking of polarization / circuit protection:

1.4 Is there a standard to conduct Input Power check and "Hi-Pot Test" to confirm that the product is in order, 100% of production?

Procedure on checking of Hi-Pot Test:
Records of checking of Hi-Pot Test:

1.5 Is there a standard running test to confirm that the product is working on based on product specification?

Procedure Running Test:
Running Test Records:

1.6 Does the facility check refrigerant quantity vs specification before final sealing (note for products that use refrigerant)

Procedure for Refrigerant quantity check:
Records of refrigerant quantity:

1.7 Does the supplier have a defined process to develop new items? Does the factory design and develop articles for different Markets?

Design and Development procedure:
Records of inhouse design and development:
Products that where designed and developed inhouse:

1.8 Does the factory have a ESD Procedure and control?

ESD Procedure:
ESD Checking records:

1.9 Is there a Life test conducted for the Final product and data of life test analyzed and kept

Procedure of Life Test (Reliability Test):
Records of Life Test (Reliability Test):
Life Testing Area:

1.10 Does the factory have a ESD Procedure and control?

Training records for Final Test and Final Visual Inspection:
Training documents/material used for specialized training:
Section 2: On Boarding Document

8.2.1 Certificate of Electrical Appliances

Certificate of Electrical Appliances:

8.2.2 Radio Certification

Radio Certification:

8.2.3 Radio Test Report

Radio Test Report:

8.2.4 Energy Efficiency Test Report

Energy Efficiency Test Report:

8.2.5 Energy Efficiency Registration Confirmation

Energy Efficiency Registration Confirmation:

8.2.6 Korean User Manual

Korean User Manual:

8.2.7 B-type Letter

B-type Letter:

8.2.8 Artwork (Korean Label)

Artwork (Korean Label):

8.2.9 Artwork (Korean Label)

Artwork (Korean Label):

8.2.10 Overseas Manufacturer Code

Overseas Manufacturer Code:

8.2.11 Factory Registration Certificate

Factory Registration Certificate:

8.2.11 Factory Registration Certificate

Factory Registration Certificate:

8.2.12 Factory Registration Certificate

Factory Registration Certificate:

8.2.13 Manufacturer Confirmation Letter

Manufacturer Confirmation Letter:

8.2.13 Pre-shipment Inspection Report

Pre-shipment Inspection Report:

8.2.14 test report

test report:

8.2.15 Technical Document(Circuit Diagram, Block Diagram, Product Specification Sheet and etc)

Technical Document(Circuit Diagram, Block Diagram, Product Specification Sheet and etc):